Solid Waste Disposal

Lining work for sanitary landfill

SIGNIFICANT EXPERIENCES

Turkey
Solid Waste Management in Balıkesir Municipality - Preparation of a Feasibility Study, EIA, ISPA Application Form and Project Fiche. Read more...

South Africa
Elaboration of a Feasibility Study and Final Design for an Advanced Integrated Solid Waste Management System for uMgungundlovu District Municipality.

Azerbaijan
Consulting Services for Design and Im- plementation of a Waste Information System. Read more...

Belize
Design of Cost Recovery Mechanism for the Solid Waste Management Project for the Western Corridor.

Guyana
Georgetown Solid Waste Management Programme - Institutional Strengthening and Supervision of Works and Operation Consultancy. Read more...

Palestine
Solid Waste and Environmental Management Project (SWEMP) - West Bank and Gaza – Design and Supervision of Construction. Read more...

Kenya
Provision of Consultancy Services for Solid Waste Management Facilities. Read more...


DETAILS

Turkey

Hydroplan Solid Waste Disposal Turkey  Hydroplan Solid Waste Disposal Turkey

Solid Waste Management in Balıkesir Municipality in Turkey.

Overall Objective:
The overall aim of the Solid Waste Management project is to accelerate Turkey's accession by enabling Turkey to achieve a high level of environmental protection and compliance with the EU waste sector directives. Establishment of a solid waste management system for the Balıkesir municipality in accordance with the Turkish Legislation and the EU Acquis will reduce the pollution of groundwater and environment in Balıkesir Municipality and increase reuse and recycling. The specific objective of this assignment is to prepare the Feasibility Study, Detailed Design and Tender Documents, EIA, ISPA application form and project fiche which will allow implementing necessary precautions for meeting of the quality standards of European Union.

  • Services provided
  • Preparation of Feasibility Study including: Assessment of the current system. Investments Requirements. Cost-effectiveness analysis of proposed solution. Description of proposed elements with the technical and financial key parameters. Financial Analysis of the Project (Financial Model). Project Implementation Schedule.
  • Environmental Impact Assessment (EIA)
  • Project Fiche / Logframe Matrix.
  • Application Form for ISPA.
  • Detailed Design of proposed measures.
  • Preparation of Tender Documents according to FIDIC Red Book for proposed measures.

Period:
12/2005 – 04/2008

Back on top


DETAILS

Azerbaijan

Hydroplan Solid Waste Disposal Azerbaijan  Hydroplan Solid Waste Disposal Azerbaijan

Integrated Solid Waste Management – Consulting Services for Design and Implementation of a Waste Information System (WIS), Azerbaijan.

Overall Objective:
The overall objective is to support the reform of the Greater Baku solid waste collection and disposal operations into an effective and sustainable system in the field of improved environmental conditions at the existing waste disposal sites, the built-up of operational, managing and communication capabilities, the rollout of collection services, as well in the field of data collection and planning.

  • Services provided
  • Design, development and Implementation of a Waste Information System (WIS).
  • Assistance to the Client to procure the necessary software licenses and hardware required for installation and operation of the WIS by the Beneficiary.
  • Provision of targeted training of staff in the operation of the WIS for 15 months.
  • Development of specifications and facilitation of procurement and installation of any additional hardware, software and network security.

Period:
06/2012 – 03/2015

Back on top


DETAILS

Guyana

Hydroplan Solid Waste Disposal Guyana  Hydroplan Solid Waste Disposal Guyana

Georgetown Solid Waste Management Programme – Institutional Strengthening and Supervision Consultancy, Guyana.

Overall Objective:
The overall objectives are to strengthen and build capacity related to all institutional aspects of the implementation of the Georgetown Solid Waste Management Programme and in particular the Municipal Solid Waste Management Department (MSWMD). The roles and capacity within the MSWMD should be developed and particularly focus on strengthening capacity to manage accounts, procurement and contract management. The Consultant is to develop, agree and implement the details of the institutional and legal framework related to an integrated system of solid waste management in Georgetown, including roles and responsibilities, waste collection contracts, development of legislation and legal instruments, etc. Also, waste management plans for the Georgetown Municipality and the participating Neighborhood Democratic Councils (NDCs) are to be elaborated with the long-term goal to dispose their water at the Haags Bosch landfill site whose construction will also be supervised and overseen during the first year of operation.

  • Services provided
  • Strengthening the MSWMD and other key stakeholders.
  • Development and implementation of cost recovery mechanisms.
  • Development of the institutional and legal framework.
  • Development of waste management plans for MSWMD and NDCs.
  • Site supervision of the construction and operation of Haags Bosch Sanitary Landfill Facility.
  • Integration along with other components of the Georgetown Solid Waste Management Programme.

Period:
11/2008 – 08/2012

Back on top


DETAILS

Palestine

Hydroplan Solid Waste Disposal Palestine  Hydroplan Solid Waste Disposal Palestine

develoPPP.de-Project - Composting of Organic Waste and Production of Organic Fertilizers in the Governorates of Hebron and Ramallah - West Bank, Palestine.

Overall Objective:
The overall objective of the measure is the introduction of a waste management concept dealing with the recycling of organic waste using new technologies for the production of an organic fertilizer as well as the demonstration of the possibilities of producing an organic fertilizer from compost through the establishment of a demonstration plant at the Al Minya landfill. Within the PPP project, a draft for a guideline on the treatment and recycling of organic waste will be developed and discussed with the Ministry of Environment and the Palestine Standards & Metrology Organization and presented as a model for a Palestinian decree.

  • Services provided
  • Establishment of the organizational requirements through the installation of the corresponding cooperation and the development of a Project team.
  • Design, construction and commissioning of the pilot plant, ensuring of the sustainable operation.
  • Consulting and training of the relevant authorities and stakeholders involved.
  • Development of a guideline for dealing with organic waste.
  • Transfer of expertise via collaboration with universities.

Period:
12/2012 – 03/2015

Back on top


DETAILS

Kenya

Hydroplan Solid Waste Disposal Kenya  Hydroplan Solid Waste Disposal Kenya

Kenya Municipal Program (KMP) - Provision of Consultancy Services for Solid Waste Management Facilities.

Overall Objective:
The overall objective is to identify a suitable site for the development of appropriate solid waste management facilities, including sanitary landfill and to prepare Detailed Designs, Environmental Impact Assessment reports, resettlement action plans, Bidding Documents and operations / maintenance manuals for the towns of Eldoret, Machakos, Thika, Embu, Malindi, Nyeri, Garissa.

  • Services provided
  • Development of baseline for landfill planning.
  • Identification of potential sites.
  • Carry out technical surveys on the selected sites.
  • Carrying out of technical surveys and of the Environmental Impact Assessment (EIA) of the facilities to be implemented including resettlement action plan.
  • Development of conceptual designs which provide adequate environmental protection, including proposed mitigation.
  • Development of estimated costs including a breakdown of foreign exchange and local costs, and development of a cash flow projection for investment and operation.
  • Preparation of Detailed Designs, Tender and Contract Documents for the proposed measures. Elaboration of operation and maintenance manuals.

Period:
01/2013 – 06/2015

Back on top